Freeport Duplex Build

Empower Projects is undertaking the construction of a custom duplex residence on Coral Road in the Bahamas. This project involves the transformation of client-provided plans into a turnkey solution, with an anticipated completion date in 2025. This overview will showcase the construction progress of this exciting development.

Project Scope

  • Client Plans Conversion: The project commenced with the conversion of client-provided architectural plans to Empower Projects' specifications. This process ensures that the design aligns with both the client's vision and Empower Projects' construction methodologies and standards.

  • Turnkey Solution: Empower Projects is delivering a complete turnkey solution. This encompasses all aspects of the construction process, from initial planning and foundation work to the finishing touches on the interior and exterior.

  • Duplex Residence: The project involves the construction of a duplex, a multi-family dwelling with two separate living units. This design is intended to maximize land use and provide flexible living options.

  • Coral Road Location: The duplex is located on Coral Road in the Bahamas, a location that may offer unique advantages such as proximity to the coast, specific community features, and the overall Bahamian environment.

  • 2025 Completion: The project is currently scheduled for completion in 2025.

EXTERIOR RENDERS

INTERIOR RENDERS

Progress

This overview aims to showcase the construction progress. Specific details may include:

  • Site Preparation: Initial activities likely included site clearing, excavation, and preparation of the building foundation.

  • Foundation Work: Construction of the foundation, which is critical for the structural integrity of the building.

  • Framing: Erection of the structural framework of the duplex, including walls, floors, and roof.

  • Exterior Work: Installation of roofing, windows, doors, and exterior cladding.

  • Interior Work: Build-out of the interior spaces, including framing of rooms, installation of electrical wiring, plumbing, and HVAC systems, and application of insulation.

  • Finishing: Interior and exterior finishing, including drywall, painting, flooring, installation of fixtures, and landscaping.

FOUNDATION

WALL CONSTRUCTION

VIDEO PROGRESS

Middle Turks and Caicos Pilot Build

Empower Projects is set to embark on a unique project in the heart of Turks and Caicos, centred around the integration of our proven turnkey home model components and advanced wall systems into a client-supplied architectural design. This project signifies a tailored approach, blending the efficiency and quality of our standardized systems with the specific aesthetic and functional requirements of the client.

Key Project Elements:

  • Client-Centric Customization:

    • This project will deviate from a standard Empower model by adapting our structural and wall systems to fit the client's pre-existing architectural plans.

    • This ensures that the client's vision is realized while still leveraging the benefits of our efficient construction methods.

  • Turn-Key Model Component Integration:

    • We will utilize our turn-key model's core components, including our high-performance wall systems, to ensure structural integrity, energy efficiency, and rapid assembly.

    • This will allow for a faster build time than traditional construction.

  • Advanced Wall System Deployment:

    • Our proprietary wall systems, known for their durability and thermal performance, will be adapted to meet the specific climate and environmental demands of Turks and Caicos.

    • This will provide a robust and comfortable living space.

  • Turks and Caicos Environment:

    • The project will take into account the unique environmental factors of the region, including hurricane resilience, salt air exposure, and tropical climate considerations.

    • This will ensure the longevity and sustainability of the finished home.

  • Collaborative Execution:

    • Empower Projects will work closely with the client and local contractors to ensure seamless integration and project success.

    • This will allow for local expertise to be combined with our proven building methods.

Why Turks and Caicos

The Turks and Caicos Islands are poised for significant growth, largely driven by the redevelopment of the Howard Hamilton International Airport. This expansion, coupled with the islands' already strong appeal as a luxury tourist destination, is creating substantial opportunities within the construction and housing sectors. Here's a breakdown:

Airport Redevelopment and Increased Tourism:

  • Enhanced Accessibility:

    • The airport's redevelopment aims to increase its capacity, allowing for larger aircraft and more frequent flights. This will significantly improve accessibility for international travelers, particularly from North America.  

    • Increased air traffic is expected to fuel a surge in tourism, further solidifying Turks and Caicos as a premier destination.  

  • Economic Growth:

    • Tourism is the lifeblood of the Turks and Caicos economy. The airport expansion will stimulate economic growth, creating opportunities across various sectors, including hospitality, retail, and construction.  

PROGRESS

Empower Projects is making significant strides in our unique project in Turks and Caicos, where we are integrating our turn-key home model components and advanced wall systems into a client's custom architectural design. This project highlights our ability to deliver tailored solutions, blending the efficiency and quality of our standardized systems with bespoke client vision.

Container Arrives

Land Clearing: The initial phase of any project involves preparing the site for construction. Local contractors typically handle this process, which includes removing any vegetation, debris, and other obstructions present on the land. Proper land clearing is essential for ensuring a stable base for the foundation.

Excavation: Once the land is cleared, the next step is to excavate the area that will house the foundation. The dimensions and depth of the excavation are determined by the specific design and engineering requirements of the home. Precision in this stage is crucial for the structural integrity of the building.

Foundation Pouring: With the excavation complete, the concrete foundation is poured. This process involves placing and leveling concrete within the excavated area, often reinforced with rebar for added strength. The foundation provides a solid and level base upon which the rest of the structure will be built. Curing time for the concrete is a critical factor in this stage.

Putting Up The Walls

Wall System Installation: Empower Projects utilizes a unique wall system. The system components are delivered to the site, and the installation process begins. A key feature of this system is its adaptability. On-site modifications are possible, as the engineered panels can be cut and shaped using tools like saws or hot knives. This allows for adjustments to accommodate specific site conditions or design changes. This flexibility can be very useful in managing unforeseen issues that may arise during the construction process

May Update

We're thrilled to share the latest news from our Turks and Caicos project! The walls are now standing tall, and the roof is officially on! It's incredible to see the structure taking shape under the beautiful Caribbean sun.

This marks a significant milestone in bringing this vision to life. Stay tuned for more updates and behind-the-scenes glimpses as we continue to move closer to completion. We can't wait to share the next stages with you!

Project Description: Bequia Model, Freeport

The Bequia model, a contemporary coastal home, was successfully completed for a discerning client in Freeport in 2023. Inspired by a contemporary coastal mood board, the design evolved through a modified rendering process to perfectly align with the client's specific vision. The completed residence boasts stunning window features, thoughtfully incorporated to maximize the breathtaking views of the adjacent canal.

Key Project Elements: Bequia Model, Freeport

  • Project Name: Bequia Model, Freeport

  • Location: Freeport

  • Completion Year: 2023

  • Client Input: Contemporary coastal mood board

  • Design Process: Modified rendering to client specifications

  • Key Feature: Stunning windows with canal views

  • Architectural Style: Contemporary Coastal